Home | About Us | Our Services | Range of Work and Customers | Examples of Contracts Undertaken | History | Awards and Achievements | Health and Safety | Solar Systems | Domestic Customers | Waranty for Domestic Clients | Customer Feedback | Training and Recruitment | Policies | Suppliers | Tax, Insurance, Registration | Links | Contact Us

Looking for a reliable and dependable roofing company? 

newtrustmark.jpg

It goes without saying that the roof over your head is one of the most important parts of your home, protecting you and your possessions and assets from the elements. Whether you need a repair, a new roof, or are replacing an existing roof, using a NFRC member contractor to carry out the work will give you the peace of mind that you are appointing a qualified roofing contractor.

FREE 10 YEAR INSURANCE BACKED WARANTY

We offer a FREE 10 year post completion insurance backed warranty on all our domestic contracts between the value of £250 and £50,000. Please see section on Waranty for further information

If you are planning to renew your roof please remember that Part L of the Building Regulations now require the roof insulation to be upgraded to achieve a minimum U value. This can be as easy as fitting additional layers of insulation in a normal cold space attic or for room in the roof situations it will require a more complicated system of insulation boards. We can advise you which solution is the best and most cost effective. You may be eligible for a grant for help with these costs.

nfrc.JPG


Re-roofing at Tonyrefail


Re-roofing in Plain tiles, West Drive, Porthcawl


Re-roofing of Tabernacle Chapel in progress, Pontycymmer in Brazilian Slate


Re-roofing at Nevil Road, Porthcawl in fibrecement slate

Roof Renovation and Repair: A short guide to the Homeowner – How to Comply with the Requirements of the Building Regulations

 

The Building Regulations – Approved Document L – in a nut shell.

 

In April 2006 the revised Part L of the building regulations came into force with the objective of implementing the EU’s Energy Performance of Building Directive.

This has the aim to reduce energy use in buildings. Part L of the building regulations is concerned with the Conservation of Fuel and Power Buildings.

The key requirements:

 

The Objective of Part L of the Building Regulations 2006 is to reduce the energy use in buildings by at least 20% compared with 2002 regulations

 

 The regulations come into effect when 25% or more of a roof’s area is being refurbished. In simple terms it means that the whole of that roof must be brought up to the thermal efficiency demanded by the current regulations.

 

 A strip and re-roof or even just the provision of a new layer of waterproofing, for example re-felting to upgrade the thermal performance of the roof.

 

 This will, in most refurbishment instances (unless the existing roof meets a minimum “U” value) require the provision of additional thermal insulation to achieve an improved “U” value in accordance with the regulations. If such an upgrade is not technically or functionally feasible or would not achieve a simple pay back of 15 years or less, the element should be upgraded to the best standard that is technically and functionally feasible and which can be achieved within a simple payback period no greater than 15 years.

 

How to comply:

 

 Before work on a roof is carried out the Local Council i.e. the Local Area Building Control must be informed of the intention to carry out work.

 

 Details and extent of the proposed work should be confirmed to the LABC within an application to repair/ renovate.

 

 Work can begin prior to approval in the case of emergency repairs.

 

 The Building Control will inspect the work periodically to ensure compliance with the building regulations and the drawings/ specifications supplied in the application. A Completion Certificate will be issued at the end if the contract.

 

What happens if this process is not carried out?

 

 There is a maximum fine of £5000 for each of non-compliance with the regulations and this would fall on the homeowner and/or the roofing contractor.

 

 Roof work may be halted if started without the LABC being informed and any work opened up for inspection.

 

 If work is carried out without a Building Control completion certificate then the homeowner will experience difficulties when coming to sell the house.

 

The homeowner CANNOT opt out form having their insulation upgraded to Part L unless it can be proved that the payback period (to the building) will be more than 15 years or the work is not technically feasible. Even then the roof should be upgraded to the best standard that is technically feasible and will achieve a payback within 15 years.

 

What must a homeowner do if considering refurbishment or repair to his/her roof?

 

 Contact the NFRC (or access via the website) or obtain a list of specialist contractors in the area.

 

 Obtain a number of comparative quotations and specifications for the work.

 

 With the chosen roofing contractors ensure the Local Area Building Control is informed.

 

Remember the so called “roofer” with a van and a ladder can cost the homeowner dearly if any work carried out is not with the approval of Building Control.

 

For advice and assistance contact The National Federation of Roofing Contractors Ltd.

NFRC Ltd

Roofing House

31 Worship Street

London EC2A 2DY

Tel: 0207 638 ROOF


Part L Advice Sheet

logonfrc.JPG

Call us now for a quotation on 01656 650053 or email your requirements to sales@treforesttiling.co.uk

Quality, Service, Customer Care, Safety 
 a complete package

Areas Covered; Carmarthen, Llanelli, Swansea, Neath, Port Talbot, Bridgend, Llantrisant, Rhondda, Cardiff, Newport, Merthyr, South Wales